Religious Studio

UNITED METHODIST CHURCH
Black River Falls, Wisconsin
An addition to an existing facility to increase the worship area capacity, enlarge the Narthex, and add classrooms. The addition must make the entire facility barrier free accessible and blend comfortably with the existing architecture.
MARIA ANGELORUM CHAPEL
La Crosse, Wisconsin
The interior renewal of the St. Rose Convent sanctuary area in a beautiful turn of century mother house chapel. The design work involves sensitively moving the altar out and reorientating the pews in the transept. The new work must inconspicuously blend into the existing space.
ST. MARY'S CHURCH
Caledonia, Minnesota
Liturgical renewal of an early 20th century Catholic church that addresses issues of developing a Gathering Area, improving and increasing the seating, barrier-free accessibility, and post Vatican II directives.
FIRST PRESBYTERIAN CHURCH
La Crosse, Wisconsin
A remodeling to the existing building which provided barrier free accessibility to all five levels, reorienting the axial sanctuary to the short axis, and a seamless addition. The new space accommodates pre and post service gatherings, a small chapel, and increasing Christian education needs.
ST. ELIZABETH ANN SETON
PARISH CENTER
Holmen, Wisconsin
The creation of an 11,500 square foot Catholic Center for worship, fellowship, education, and administrative purposes for a new parish of 300 families.
MIDDLE COON VALLEY
LUTHERAN CHURCH
Chaseburg, Wisconsin
An addition to a small country church that doubles its size and provides handicap accessibility, yet still preserves its natural charm and beauty.
GRACE EVANGELICAL
LUTHERAN CHURCH
Prairie du Chien, Wisconsin
The design of a 5,500 square foot combined worship/fellowship space and two classroom day school for a new congregation. The solution must accommodate future growth and expansion.
FIRST LUTHERAN CHURCH
Onalaska, Wisconsin
Remodeling of the basement Fellowship Hall to make it more useful, comfortable, and attractive. This work was triggered by the need for structural reinforcement (Sheffield tile) in this area.
OUR SAVIOR'S LUTHERAN
CHURCH
La Crosse, Wisconsin
The renovation of the existing Chancel area to provide more flexibility and meet changing liturgical requirements. The Chancel furnishings were redesigned to compliment the space.
VILLA ST. JOSEPH
La Crosse, Wisconsin
A liturgical renewal of the Chapel and a complete remodeling of the Dining Area for the Sisters of Perpetual Adoration.
FIRST CONGREGATIONAL
CHURCH
Menomonie, Wisconsin
The design of a complementing 3,600 square foot addition to a 1892 Richardsonian Romanesque styled church. The addition contains a Fellowship Hall, classrooms, administrative offices, and an elevator which makes the entire complex barrier free accessible.
CHRIST EPISCOPAL CHURCH
La Crosse, Wisconsin
A complete Feasibility Study to develop a masterplan for the phased remodeling of the entire facility. The report worked with the parish's mission statement to create a complete remodeling program with construction estimates and prioritized implementation plans. The first phase of restoring the original Narthex, and the second phase of adding an elevator, are complete.
ST. MARY'S CATHOLIC CHURCH
Tomah, Wisconsin
A Feasibility Study that develops a short and long range plan for the remodeling and modernization of the entire church facility. The report analyzes the condition of the interior and exterior, the facility, and its equipment. Cost estimates for the proposed work are included to establish a prioritized implementation plan.
HOLY FAMILY CATHOLIC
CHURCH
LaValle, Wisconsin
The addition of a new 4,800 SF Worship Center to the original church. The new Center has a flexible Sanctuary for 300 people, a Eucharistic Chapel, Reconciliation Room and barrier-free restrooms.
ST. MARY'S CATHOLIC CHURCH
Tomah, Wisconsin
A complete interior rehabilitation of the original church environment to include a new Gathering/Overflow Area as you enter, a barrier-free restroom, a Reconciliation Room, and a liturgical renewal of the church. The changes to the church include all new finishes, sound system, lighting, pew refinishing, altar furnishings, and a redesigned Sanctuary space.
FIRST CONGREGATIONAL
CHURCH
La Crosse, Wisconsin
The interior remodeling of the church built in 1952 into phased portions. Phase 1 is the rehabilitation of the Hebberd Community Room. Phase 2 is the Choir Loft and Sanctuary renewal and Narthex. Phase 3 is the Narthex and educational center remodeling.
ST. STEPHEN CHURCH
Stevens Point, Wisconsin
An interior enhancement of the present church to bring the worship environment in accord with the Environment and Art in Catholic Worship guidelines. The scope of the work includes the redesign of the Sanctuary, new lighting, and new Sanctuary furnishings.
HOLY TRINITY CHURCH
Rollingstone, Minnesota
The interior remodeling of a well preserved 125 year old stone church in rural Minnesota. The work includes the creation of a new Gathering Area at the entrance, with a barrier free restroom and Reconciliation Room. An overflow seating balcony is reinstated over the Gathering Area. The Sanctuary is redesigned with a new arched backdrop, new furnishings, and barrier free access. The entire church interior is redecorated with simple stencils and mouldings echoing the parish's historical roots.